ANG units work alongside 36 CS to operationalize Andersen AFB

U.S. Air National Guard Master Sgt. Nicholas Martinez, 205th Engineering Installation Squadron first sergeant, and Staff Sgt. Zachery Muth, 210th Engineering Installation Squadron cable antenna systems craftsman, assist Airman 1st Class Abu Bangura, 205 EIS cable antenna systems apprentice, exit a telecommunications maintenance hole on Andersen Air Force Base, Guam, July 26, 2022. U.S. Air National Guard engineering installation squadrons from across the country have integrated as one unit to work alongside the 36th Communications Squadron to refresh records and repair infrastructure on Andersen AFB. (U.S. Air Force photo by Airman 1st Class Lauren Clevenger)

PHOTO BY: Airman 1st Class Lauren Clevenger
VIRIN: 220726-F-NI202-1021.JPG
FULL SIZE: 7.02 MB
Additional Details

CAMERA

NIKON Z 6_2

LENS

NIKKOR Z 24-70mm f/4 S

APERTURE

630/100

SHUTTERSPEED

10/2500

ISO

125

IMAGE IS PUBLIC DOMAIN

Read More

This photograph is considered public domain and has been cleared for release. If you would like to republish please give the photographer appropriate credit. Further, any commercial or non-commercial use of this photograph or any other DoD image must be made in compliance with guidance found at https://www.dimoc.mil/resources/limitations, which pertains to intellectual property restrictions (e.g., copyright and trademark, including the use of official emblems, insignia, names and slogans), warnings regarding use of images of identifiable personnel, appearance of endorsement, and related matters.