HomeNewsPhotos

Photos

Runway completion brings operations changes, improvements
ANDERSEN AIR FORCE BASE, Guam - Construction workers pressure-wash a recently completed section of the South Runway. The runway is slated to re-open in mid-May and will bring added capability and safety improvements to Andersen operations. Starting April 15, all aircraft and vehicle operators will have to request approval enter or to access the controlled movement area surrounding the South Runway from the tower via two-way radio and be trained in accordance with 36th Wing Instruction 13-201. (U.S. Air Force photo by Tech. Sgt. Mike Andriacco)

Download Image: Full Size (1.57 MB)
Tags: People
Photo by: Tech. Sgt. Mike Andriacco |  VIRIN: 100413-F-5471A-001.JPG