HomeNewsPhotos

Photos

A pre-cast tilt-up panel is lifted by a crane to be put into place during construction of the vertical special capabilities warehouse, at Andersen Air Force Base, Guam, Nov. 22, 2011. The VSC is a one year project being built with pre-cast tilt-up panels, and when complete the building will be a storage for specialized construction equipment. (Courtesy photo)

Download Image: Full Size (1.71 MB)
Tags:
Photo by:  |  VIRIN: 111122-F-QZ836-001.JPG